5. Vung Ang 1 Coal Fire Power Plant



1. Project name: Vung Ang 1 Thermal Power Plant Project
2. Location: Vung Ang – Ha Tinh Province
3. Customers: 
a) Torishima Hong Kong Company
* Responsibilities: 
- Supply material, engineering service
- Install and commissioning for instrument equipment system of Main Cooling Water system.
b) Yokogawa Asia – Singapore Company
* Responsibilities: 
- Design and build Yokogawa office at Vung Ang 1 Thermal Power Plant
c) Yokogawa Singapore Company
* Responsibilities: 
- Manufacture and supply hanger and support for all electrical equipment.
d) Lilama Huyndai Construction Consultant JSC
* Responsibilities: 
- Supply technical service and make Relay.
e) Lilama Corporation
* Responsibilities: 
- Supply technical service, material and equipment for Turbine and Boiler.
- Supply material for instrumentation and control
f) Babcock & Wilcox Beijing (BWBC)
* Responsibilities: 
- Manufacture KKS nameplates.
- Install KKS nameplates for Boiler equipment of Unit 1&2.
g) Yokogawa Vietnam Company
* Responsibilities: 
- Boiler and Turbine loopcheck work.
h) Boundstead Salcon - Singapore Company
- Field instrument calibration for M Lot 3 WTP & WWTP
- MCC Low voltage site acceptance test included ACB relay protection relay setting, Motor starter feeder function test for M Lot 3 WTP & WWTP
i) Guangdong Electric Power Design Institute (GEDI)
* Responsibilities: 
- FGD performance test for Unit 1 included SO2 testing, Power measurement, Temperature/Noise measurement
j) Petro Vietnam Power Services JSC
* Responsibilities: 
- Supply spare part equipment for 02 year of operation.
k) General Equipment Solutions Co., Ltd
* Responsibilities: 
- Supply spare part equipment
l) Intelligent Building Solution JSC.,
* Responsibilities: 
- Supply equipment and material for some packages.