17. Nghi Son 1 Thermal Power Plant Project

1. Project name: Nghi Sơn 1 Thermal Power Plant
2. Location: Tinh Gia - Thanh Hoa province
3. Customer:
a, Jurong Engineering Limited - Singapore
Responsibilities:
- Supply the renting service for the even recorder for Generator Circuit Breaker (GCB) sinewave and micro ohmeter for contact resistance measurement/Technical support for GCB testing.
- Field instrumentation calibration for auxiliary boiler and main steam piping.
- Supply the man power service for commissioning work of auxiliary Boiler; Hydrogen plant/Critical steam piping.
- Field instrumentation calibration for Hydrogen system.
b, Marubeni Corporation
Responsibilities:
- Carried out loop check for all the Boiler unit 2 from field to DCS (4500IOs).
- Carried out the drive function test for all the Boiler unit 1 & 2.
- Man power service for commissioning work (engineers as site commissioning leader, electrical, mechanical, C&I engineer, Boiler engineers, Safety supervisor)
c, Hsing Sheng Engineering Co., Ltd (JAT)
Responsibilities:
- CHS/AHS commissioning work and loop check progress.
d, Foster Wheeler Service (Thailand) Ltd
Responsibilities: 
- Provide equipment and service for Boiler performance test.